BEARING,JOURNAL,TYPE DY422,INCOLOY

Material 4100082146 · BEARING · Plant 1000

AReduceSlow-moving
Material
4100082146
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 2.2 SET/year: 2.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.3.
  • 3.A 95.7% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 3 exceeds the level to keep (2) by 1.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
95.7%
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 275 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-426D
RICH AMINE BLOWER
A100.57
PX_KC-575B
METHANE COMPRESSOR
S172.71
PX_KT-383A
TURBINE FOR KC-383A
S173.67

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
15 Jul 2026LowPX_KC-575BReplace lamp as per PM finding
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
20 Mar 2026MediumPX_KC-575BKC-575B bearing temp high
13 Dec 2025MediumPX_KC-575BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
30 Dec 20251201000013760Corrective