BEARING,THRUST PAD,TYPE VJ47,GRAPHITE
Material 4100082458 · BEARING · Plant 1000
ALong-leadReorderCriticalBelow reorder point
- Material
- 4100082458
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (18 of 35 FuncLocs A/B)
- Supplier
- RAJAWALI SARANA PERSADA PT
- Lead time
- 129 d · P80 127 d
- Unit price
- Rp 403.8M
Recommendation
- 1.Forecast 12 SET/year: 9.7 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 2.Lead time ~129 days; expected demand during lead time 4.2 (incl. 0.7 planned).
- 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 10.
- 4.On hand 1 + on order 2 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 35 FuncLoc(s), 18 of them criticality A/B.
- 7.ML early warning: 78% probability of demand in the next 90 days.
Proposed purchase requisition
7 SET
Rp 2.8B · order by 01 Oct 2026
Expected arrival ≈ 129 days
Needs Management sign-off before it reaches the PR draft
Long-leadML early warningSingle sourceOpen POPlanned demand in lead time
On hand / on order
1 / 2
next delivery 16 Apr 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 5
Rec. Max
10
order qty 1
Service level
98.8%
stockout risk now 71%
Unit price
Rp 403.8M
PO history
ML early warning: 78% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 123 days ago, 23 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 35 functional locations
18 with criticality A/B · 47 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-536A LUBE OIL BLOWER | A | 1 | 11 | 4.42 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-226 HYDROGEN AIR COMPRESSOR | A | 1 | 6 | 2.28 |
| PX_KC-713B SPENT CAUSTIC FAN | A | 1 | 6 | 3.14 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PX_KC-106B GASOLINE BLOWER | A | 1 | 2 | 1.00 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PX_KC-588 CAUSTIC FAN | A | 1 | 2 | 1.00 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PX_KC-663A CONDENSATE FAN | A | 4 | 1 | 0.57 |
| PY_KC-636C SLOP OIL COMPRESSOR | A | 1 | 1 | 0.57 |
Lead time and procurement
Lead time 129 ± 40 days (PO history + category, 2 PO lines) · on-time 9%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Jun 2026 | PR03 Regular replenishment | 2 | Rp 400.4M | 16 Apr 2027 open | 308 d |
| 05 Jun 2025 | PR03 Regular replenishment | 2 | Rp 407.3M | 24 Nov 2025 | 172 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
| 07 Jul 2027 | PX_KC-505D | Compressor major overhaul | 0.72 |
| 01 Aug 2027 | PX_KC-620A | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_KC-575B | Install scaffolding at KC-575B |
| 23 Sept 2026 | Medium | PX_KC-513 | KC-513 high vibration |
| 22 Sept 2026 | High | PX_KC-536A | Overhaul |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 07 Sept 2026 | Medium | PX_KC-513 | Inspect coupling KC-513 |
| 05 Sept 2026 | Low | PX_KC-513 | Inspect coupling KC-513 |
| 03 Sept 2026 | Low | PX_KC-226 | KC-226 bearing temp high |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 31 May 2026 | 1 | 201000014894 | Corrective |
| 20 Jan 2026 | 1 | 201000021643 | Corrective |
| 08 Jan 2026 | 1 | 201000005981 | Corrective |
| 10 Oct 2025 | 1 | 201000004278 | Corrective |
| 03 Jun 2025 | 1 | 201000038361 | Corrective |