BEARING,THRUST PAD,SIZE QX38,GRAPHITE
Material 4100082488 · BEARING · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100082488
- Category
- BEARING
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (14 of 24 FuncLocs A/B)
- Supplier
- ATLAS TURBO SERVICES INC
- Lead time
- 134 d · P80 262 d
- Unit price
- Rp 142.3M
Recommendation
- 1.Forecast 13 SET/year: 11 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
- 2.Lead time ~134 days; expected demand during lead time 4.9 (incl. 0.7 planned).
- 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 14.
- 4.On hand 0 + on order 7 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 262 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 24 FuncLoc(s), 14 of them criticality A/B.
- 7.ML early warning: 30% probability of demand in the next 90 days.
Proposed purchase requisition
7 SET
Rp 996.4M · order by 01 Oct 2026
Expected arrival ≈ 134 days
Long-leadML early warningConvert to Stock ItemSingle sourceOpen POPlanned demand in lead time
On hand / on order
0 / 7
next delivery 21 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 8
Rec. Max
14
order qty 2
Service level
99.0%
stockout risk now 24%
Unit price
Rp 142.3M
PO history
ML early warning: 30% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 11 days ago, 16 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 24 functional locations
14 with criticality A/B · 37 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-713B SPENT CAUSTIC FAN | A | 1 | 6 | 3.14 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-316D METHANOL FAN | A | 1 | 5 | 1.43 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-279C C3 RECYCLE COMPRESSOR | A | 1 | 3 | 1.43 |
| PX_KC-435A FUEL OIL AIR COMPRESSOR | A | 1 | 2 | 1.00 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PY_KC-636C SLOP OIL COMPRESSOR | A | 1 | 1 | 0.57 |
| PX_KC-223 RECYCLE ETHANE FAN | A | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 134 ± 62 days (PO history, 3 PO lines) · on-time 35%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Jun 2026 | PR03 Regular replenishment | 1 | Rp 139.4M | 21 Oct 2026 open | 130 d |
| 21 May 2026 | PR06 Regular replenishment | 2 | Rp 140.6M | 14 Mar 2027 open | 297 d |
| 16 May 2026 | PR06 Regular replenishment | 1 | Rp 150.3M | 12 Dec 2026 open | 210 d |
| 14 Aug 2025 | PR10 Other | 3 | Rp 144.1M | 04 Feb 2027 open | 539 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
| 07 Jul 2027 | PX_KC-505D | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 19 Sept 2026 | Medium | PX_KC-458D | KC-458D lube oil filter DP high |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 16 Sept 2026 | Low | PX_KC-458D | KC-458D lube oil filter DP high |
| 05 Sept 2026 | Medium | PX_KC-279C | Overhaul |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2026 | 1 | 201000020402 | Corrective |
| 11 Jun 2026 | 1 | 201000023683 | Corrective |
| 18 Apr 2026 | 1 | 201000028316 | Corrective |
| 02 Jan 2026 | 1 | 201000039334 | Corrective |
| 20 Jul 2025 | 2 | 201000039281 | Corrective |
| 18 Jul 2025 | 2 | 203000031669 | Turnaround |