BEARING,THRUST PAD,TYPE EB16,CS

Material 4100082499 · BEARING · Plant 1000

ALong-leadReorderCriticalBelow reorder point
Material
4100082499
Category
BEARING
Base unit
SET
MRP type
Non Stock
Criticality
A (10 of 16 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN MAKMUR PT
Lead time
117 d · P80 127 d
Unit price
Rp 478.6M

Recommendation

  • 1.Forecast 11 SET/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~117 days; expected demand during lead time 3.5.
  • 3.A 97.1% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 10.
  • 4.On hand 1 + on order 3 is at or below the reorder point: order 6 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 16 FuncLoc(s), 10 of them criticality A/B.
Proposed purchase requisition
6 SET
Rp 2.9B · order by 01 Oct 2026
Expected arrival ≈ 117 days
Needs Management sign-off before it reaches the PR draft
Long-leadSingle sourceOpen PO
On hand / on order
1 / 3
next delivery 27 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 6
Rec. Max
10
order qty 1
Service level
97.1%
stockout risk now 43%
Unit price
Rp 478.6M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 133 days ago, 19 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 16 functional locations

10 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-452
HYDROGEN FAN
A162.71
PX_KC-732D
METHANOL COMPRESSOR
A163.14
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-447
LUBE OIL COMPRESSOR
A141.85
PX_KC-464A
CONDENSATE BLOWER
A121.43
PX_KC-178A
QUENCH OIL FAN
A100.57
PX_KC-618B
WASH WATER BLOWER
A100.57
PX_KC-624A
RECYCLE ETHANE BLOWER
B152.28
PX_KC-538
REFLUX BLOWER
S1124.85
PX_KC-513
WASH WATER BLOWER
S1104.42

Lead time and procurement

Lead time 117 ± 40 days (PO history + category, 2 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jun 2026PR03
Regular replenishment
2Rp 473.8M04 Dec 2026
open
171 d
22 Feb 2026PR06
Regular replenishment
1Rp 483.3M27 Oct 2026
open
247 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
23 Sept 2026MediumPX_KC-513KC-513 high vibration
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026EmergencyPX_KC-538Leak from packing
07 Sept 2026MediumPX_KC-513Inspect coupling KC-513
05 Sept 2026MediumPX_KC-452Overhaul
05 Sept 2026MediumPX_KC-452Inspect coupling KC-452
05 Sept 2026LowPX_KC-513Inspect coupling KC-513
01 Sept 2026MediumPX_KC-538KC-538 lube oil filter DP high
01 Sept 2026MediumPX_KC-538KC-538 high vibration

Recent goods issues

Posting dateQtyOrderOrder type
21 May 20261201000019504Corrective