Sparely
DU

BEARING,THRUST PAD,MODEL BD376,NBR

Material 4100082519 · BEARING · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100082519
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 9 FuncLocs A/B)
Supplier
ANUGRAH PERKASA PERSADA PT
Lead time
89 d · P80 127 d
Unit price
Rp 221.6M

Recommendation

  • 1.Forecast 5.9 SET/year: 5.2 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~89 days; expected demand during lead time 2.0 (incl. 0.7 planned).
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 6.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 9 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 SET
Rp 886.4M · order by 01 Oct 2026
Expected arrival ≈ 89 days
Long-leadSingle sourcePlanned demand in lead time
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
6
order qty 1
Service level
99.0%
stockout risk now 36%
Unit price
Rp 221.6M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 317 days ago, 6 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 9 functional locations

3 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KC-891A
HYDROGEN FAN
S151.85
PX_KC-730
ETHYLENE COMPRESSOR
S141.85
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 89 ± 40 days (PO history + category, 1 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
03 Feb 2026PR03
Regular replenishment
2Rp 221.6M14 Aug 2026192 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
13 Sept 2026LowPX_KC-730Overhaul
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
14 Jul 2026MediumPX_KC-730Leak from packing
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test

Recent goods issues

Posting dateQtyOrderOrder type
18 Nov 20251201000002039Corrective
11 Nov 20251201000025880Corrective