Sparely
DU

BEARING,THRUST PAD,MODEL DQ121,VITON

Material 4100082549 · BEARING · Plant 1000

AReorderCriticalBelow reorder point
Material
4100082549
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (6 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 8.2 SET/year: 8.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 1.2.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 10 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
4 SET
Rp 877.0M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
5
order qty 1
Service level
99.1%
stockout risk now 35%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 123 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 10 functional locations

6 with criticality A/B · 18 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A472.81
PX_KC-713B
SPENT CAUSTIC FAN
A263.14
PX_KC-867D
CONDENSATE FAN
A162.71
PX_KT-419A
TURBINE FOR KC-419A
A462.81
PX_KC-316D
METHANOL FAN
A151.43
PX_KC-886D
BOTTOM FAN
B141.43
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-383A
TURBINE FOR KC-383A
S273.67
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_KC-150A
HYDROGEN FAN
S121.00

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_KC-886DKC-886D high vibration
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
17 Sept 2026MediumPX_KC-867DLeak from packing
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
10 Aug 2026MediumPX_KC-316DOverhaul
03 Aug 2026MediumPX_KC-316DPainting KC-316D

Recent goods issues

Posting dateQtyOrderOrder type
31 May 20261201000015826Corrective