Sparely
DU

BEARING,THRUST PAD,SIZE JG460,GRAPHITE

Material 4100082609 · BEARING · Plant 1000

AReduceSlow-moving
Material
4100082609
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (7 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 11 SET/year: 10 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 1.6.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.Stock 71 exceeds the level to keep (8) by 63.
  • 5.Installed on 10 FuncLoc(s), 7 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
71 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.2%
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 360 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 10 functional locations

7 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PX_KC-106B
GASOLINE BLOWER
A121.00
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KC-250D
PROPYLENE FAN
A100.57
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KC-620A
DEMIN WATER AIR COMPRESSOR
B121.00
PX_KC-582B
CAUSTIC BLOWER
S1103.57
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KC-511C
FUEL OIL FAN
S110.57

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Aug 2027PX_KC-620ACompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026HighPX_KC-582BKC-582B high vibration
26 Aug 2026LowPX_KC-582BPainting KC-582B
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
08 Jul 2026LowPX_KC-582BInstall scaffolding at KC-582B
04 Jun 2026HighPX_KC-778AInspect coupling KC-778A

Recent goods issues

Posting dateQtyOrderOrder type
06 Oct 20252201000009779Corrective