BEARING,THRUST PAD,SIZE KZ121,GRAPHITE

Material 4100082772 · BEARING · Plant 1000

AReorderCriticalSlow-moving
Material
4100082772
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 9.3 SET/year: 8.6 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 2.0 (incl. 0.7 planned).
  • 3.A 92.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
6 SET
Rp 1.3B · order by 01 Oct 2026
Expected arrival ≈ 55 days
Needs Management sign-off before it reaches the PR draft
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 2
Rec. Max
7
order qty 3
Service level
92.9%
stockout risk now 35%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 258 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-452
HYDROGEN FAN
A162.71
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
05 Sept 2026MediumPX_KC-452Overhaul
05 Sept 2026MediumPX_KC-452Inspect coupling KC-452
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Jan 2026MediumPX_KC-452Replace lamp as per PM finding
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
11 Nov 2025MediumPX_KC-235DLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
16 Jan 20263201000014196Corrective