BEARING,THRUST PAD,MODEL SR125,INCOLOY

Material 4100083032 · BEARING · Plant 1000

AReduceNon-moving
Material
4100083032
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 0.3 SET/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 96.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 6 exceeds the level to keep (1) by 5.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
4 / 10
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
96.1%
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 129.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-308B
REFLUX BLOWER
A162.28
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PX_KC-422A
C4 PRODUCT BLOWER
S162.71

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Sept 2026MediumPX_KC-308BInstall scaffolding at KC-308B
08 Jul 2026MediumPX_KC-422AKC-422A high vibration
04 Jun 2026HighPX_KC-308BRepair insulation KC-308B
04 Jun 2026HighPX_KC-778AInspect coupling KC-778A
08 May 2026MediumPX_KC-308B[MSI-B-26-PPX-327] Permanent repair
03 Mar 2026LowPX_KC-422ALeak from packing
20 Jan 2026LowPX_KC-422ALeak from packing
29 Nov 2025MediumPX_KC-308BKC-308B lube oil filter DP high
24 Nov 2025LowPX_KC-422AKC-422A lube oil filter DP high
12 Nov 2025LowPX_KC-308BOverhaul

Recent goods issues

Never issued in the 17-month history.