BEARING,THRUST PAD,TYPE AS180,A105
Material 4100083106 · BEARING · Plant 1000
AReorderCriticalStockout
- Material
- 4100083106
- Category
- BEARING
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 219.3M (est.)
Recommendation
- 1.Forecast 2.6 SET/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.4.
- 3.A 98.3% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 SET
Rp 877.0M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
98.3%
stockout risk now 18%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 33 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 636.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 2 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-447 LUBE OIL COMPRESSOR | A | 2 | 4 | 1.85 |
| PX_KC-106B GASOLINE BLOWER | A | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Aug 2026 | Medium | PX_KC-447 | Leak from packing |
| 07 Jul 2026 | Medium | PX_KC-447 | Replace lamp as per PM finding |
| 11 Feb 2026 | Low | PX_KC-106B | KC-106B high vibration |
| 07 Sept 2025 | Medium | PX_KC-447 | Replace lamp as per PM finding |
| 18 May 2025 | Medium | PX_KC-447 | Replace lamp as per PM finding |
| 16 May 2025 | Low | PX_KC-106B | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Aug 2026 | 2 | 201000038773 | Corrective |