Sparely
DU

BEARING,THRUST PAD,SIZE FL964,A182F11

Material 4100083550 · BEARING · Plant 1000

AReduceNon-moving
Material
4100083550
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 219.3M (est.)

Recommendation

  • 1.Forecast 0.8 SET/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~55 days; expected demand during lead time 0.7 (incl. 0.7 planned).
  • 3.A 98.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 21 exceeds the level to keep (2) by 19.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
21 / 0
no open PO
Today Min / Max
3 / 9
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.5%
stockout risk now 0%
Unit price
Rp 219.3M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 50.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_KT-513
TURBINE FOR KC-513
A121.53

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
11 Nov 2025MediumPX_KC-235DLeak from packing
16 May 2025LowPX_KC-235DLeak from packing
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Never issued in the 17-month history.