BEARING,THRUST PAD,TYPE IG44,GRAPHITE

Material 4100083642 · BEARING · Plant 1000

SReduceSlow-moving
Material
4100083642
Category
BEARING
Base unit
SET
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI SARANA PERSADA PT
Lead time
101 d · P80 127 d
Unit price
Rp 369.5M

Recommendation

  • 1.Forecast 0.8 SET/year: 0.0 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~101 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 4 exceeds the level to keep (0) by 4.
Convert to Non StockSingle sourceOpen PO
On hand / on order
4 / 2
next delivery 07 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 369.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 86,226/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~23 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-505D
METHANE COMPRESSOR
S111.00

Lead time and procurement

Lead time 101 ± 40 days (PO history + category, 2 PO lines) · on-time 9%

PR dateTypeQtyUnit priceDeliveryLead time
10 Jun 2026PR05
Project / turnaround
2Rp 374.0M07 Dec 2026
open
180 d
07 Mar 2026PR03
Regular replenishment
1Rp 364.9M14 Aug 2026160 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
07 Jul 2027PX_KC-505DCompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Jun 2025HighPX_KC-505DRepair insulation KC-505D

Recent goods issues

Posting dateQtyOrderOrder type
31 Jul 20251203000033054Turnaround