SEAL,LABYRINTH,MODEL HZ113,PTFE
Material 4100084471 · SEAL · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100084471
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (11 of 22 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN MAKMUR PT
- Lead time
- 137 d · P80 213 d
- Unit price
- Rp 175.9M
Recommendation
- 1.Forecast 11 SET/year: 9.6 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
- 2.Lead time ~137 days; expected demand during lead time 4.3 (incl. 0.7 planned).
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 12.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 12 now.
- 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 22 FuncLoc(s), 11 of them criticality A/B.
- 7.ML early warning: 57% probability of demand in the next 90 days.
Proposed purchase requisition
12 SET
Rp 2.1B · order by 01 Oct 2026
Expected arrival ≈ 137 days
Needs Management sign-off before it reaches the PR draft
Long-leadML early warningConvert to Stock ItemSingle sourcePlanned demand in lead time
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 7
Rec. Max
12
order qty 1
Service level
99.6%
stockout risk now 96%
Unit price
Rp 175.9M
PO history
ML early warning: 57% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 395 days ago, 14 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 22 functional locations
11 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-536A LUBE OIL BLOWER | A | 1 | 11 | 4.42 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KC-452 HYDROGEN FAN | A | 1 | 6 | 2.71 |
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KC-155D CAUSTIC BLOWER | A | 1 | 0 | 0.57 |
| PX_KC-618B WASH WATER BLOWER | A | 1 | 0 | 0.57 |
| PX_KC-669 DEMIN WATER BLOWER | A | 1 | 0 | 0.57 |
| PX_KC-620A DEMIN WATER AIR COMPRESSOR | B | 1 | 2 | 1.00 |
| PX_KC-371B BOTTOM FAN | B | 1 | 0 | 0.57 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
Lead time and procurement
Lead time 137 ± 65 days (PO history + category, 2 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Jun 2026 | PR03 Regular replenishment | 2 | Rp 173.6M | 21 Sept 2026 | 103 d |
| 01 Sept 2025 | PR06 Regular replenishment | 2 | Rp 178.2M | 10 Jan 2026 | 131 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
| 01 Aug 2027 | PX_KC-620A | Compressor major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-365C | KC-365C lube oil filter DP high |
| 22 Sept 2026 | High | PX_KC-536A | Overhaul |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 05 Sept 2026 | Medium | PX_KC-452 | Overhaul |
| 05 Sept 2026 | Medium | PX_KC-452 | Inspect coupling KC-452 |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Aug 2026 | High | PX_KC-536A | KC-536A bearing temp high |
| 26 Jul 2026 | Medium | PX_KC-365C | Inspect coupling KC-365C |
| 24 Jul 2026 | High | PX_KC-536A | Install scaffolding at KC-536A |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Sept 2025 | 1 | 201000038656 | Corrective |
| 11 Jul 2025 | 1 | 201000000144 | Corrective |