SEAL,LABYRINTH,SIZE MJ351,PTFE

Material 4100084479 · SEAL · Plant 1000

AReorderCriticalStockout
Material
4100084479
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (5 of 17 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 22 SET/year: 20 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
  • 2.Lead time ~150 days; expected demand during lead time 9.0 (incl. 0.7 planned).
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 29.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 29 now.
  • 5.Installed on 17 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
29 SET
Rp 2.7B · order by 01 Oct 2026
Expected arrival ≈ 150 days
Needs Management sign-off before it reaches the PR draft
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 19
Rec. Max
29
order qty 2
Service level
99.6%
stockout risk now 91%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 201 days ago, 11 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 15.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 17 functional locations

5 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A272.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_KC-476C
ETHYLENE FAN
A100.57
PX_KC-620A
DEMIN WATER AIR COMPRESSOR
B121.00
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KC-422A
C4 PRODUCT BLOWER
S362.71
PX_KC-891A
HYDROGEN FAN
S151.85
PX_KC-830D
FLUSHING OIL BLOWER
S141.85
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
07 Jul 2027PX_KC-505DCompressor major overhaul0.72
01 Aug 2027PX_KC-620ACompressor major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
14 Mar 20262201000019387Corrective