SEAL,LABYRINTH,SIZE GP190,CS
Material 4100084505 · SEAL · Plant 1000
AReduceExcess
- Material
- 4100084505
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (7 of 10 FuncLocs A/B)
- Supplier
- ANUGRAH PERKASA PERSADA PT
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 197.5M
Recommendation
- 1.Forecast 7.8 SET/year: 7.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~150 days; expected demand during lead time 3.2.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 12.
- 4.Stock 92 exceeds the level to keep (12) by 80.
- 5.Installed on 10 FuncLoc(s), 7 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
92 / 1
next delivery 03 Apr 2028
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 8
Rec. Max
12
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 197.5M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 168 days ago, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 11.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 10 functional locations
7 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-316D METHANOL FAN | A | 1 | 5 | 1.43 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-279C C3 RECYCLE COMPRESSOR | A | 1 | 3 | 1.43 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PX_KC-853D SLOP OIL COMPRESSOR | B | 1 | 4 | 1.85 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KC-365C INHIBITOR BLOWER | S | 1 | 7 | 3.14 |
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time 50%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Mar 2026 | PR05 Project / turnaround | 1 | Rp 197.5M | 03 Apr 2028 open | 748 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-365C | KC-365C lube oil filter DP high |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 05 Sept 2026 | Medium | PX_KC-279C | Overhaul |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 10 Aug 2026 | Medium | PX_KC-316D | Overhaul |
| 03 Aug 2026 | Medium | PX_KC-316D | Painting KC-316D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Apr 2026 | 1 | 201000025702 | Corrective |