SEAL,LABYRINTH,MODEL ZU580,PTFE
Material 4100084528 · SEAL · Plant 1000
AReorderCriticalStockout
- Material
- 4100084528
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (3 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 5.0 SET/year: 5.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~150 days; expected demand during lead time 2.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 8.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
- 5.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 756.7M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 5
Rec. Max
8
order qty 1
Service level
99.9%
stockout risk now 87%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 304 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 6 functional locations
3 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KC-778A CONDENSATE COMPRESSOR | A | 1 | 3 | 1.43 |
| PX_KC-624A RECYCLE ETHANE BLOWER | B | 1 | 5 | 2.28 |
| PX_KT-447 TURBINE FOR KC-447 | S | 3 | 13 | 6.24 |
| PX_KC-830D FLUSHING OIL BLOWER | S | 1 | 4 | 1.85 |
| PX_KT-624A TURBINE FOR KC-624A | S | 2 | 3 | 2.39 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 21 Aug 2026 | Medium | PX_KC-624A | KC-624A high vibration |
| 10 Aug 2026 | Medium | PX_KC-624A | Leak from packing |
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 18 Jun 2026 | Low | PX_KC-624A | Overhaul |
| 04 Jun 2026 | High | PX_KC-778A | Inspect coupling KC-778A |
| 31 May 2026 | Low | PX_KC-830D | KC-830D high vibration |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Dec 2025 | 1 | 201000010935 | Corrective |