SEAL,LABYRINTH,TYPE NS869,SS304
Material 4100084723 · SEAL · Plant 1000
AReorderCriticalStockout
- Material
- 4100084723
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 2.5 SET/year: 2.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~150 days; expected demand during lead time 1.0.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 472.9M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
5
order qty 1
Service level
99.6%
stockout risk now 64%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 353 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 4 functional locations
4 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 17 May 2026 | Low | PX_KC-396 | Overhaul |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 02 Apr 2026 | Medium | PX_KT-397A | Follow up after steam upset KT-397A |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Oct 2025 | 1 | 201000030049 | Corrective |