Sparely
DU

SEAL,LABYRINTH,TYPE YP972,GRAPHITE

Material 4100085036 · SEAL · Plant 1000

AReduceNon-moving
Material
4100085036
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 0.2 SET/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~150 days; expected demand during lead time 0.1.
  • 3.A 93.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 5 exceeds the level to keep (1) by 4.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
93.7%
stockout risk now 0%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 237.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-752A
CONDENSATE BLOWER
A141.85
PX_KC-886D
BOTTOM FAN
B141.43
PX_KC-210D
ETHYLENE BLOWER
S100.57

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_KC-886DKC-886D high vibration
10 Jul 2026MediumPX_KC-886DInstall scaffolding at KC-886D
20 Apr 2026LowPX_KC-886DReplace lamp as per PM finding
10 Dec 2025MediumPX_KC-752AReplace lamp as per PM finding
18 Oct 2025MediumPX_KC-752AReplace lamp as per PM finding
21 Sept 2025LowPX_KC-752AOverhaul
12 May 2025LowPX_KC-752ALeak from packing
04 May 2025MediumPX_KC-886D[MSI-B-25-PZW-222/M] Replace line

Recent goods issues

Never issued in the 17-month history.