Sparely
DU

SEAL,LABYRINTH,SIZE WU515,PTFE

Material 4100085413 · SEAL · Plant 1000

AReorderCriticalStockout
Material
4100085413
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 1.8 SET/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~150 days; expected demand during lead time 0.8.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 SET
Rp 378.4M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.2%
stockout risk now 53%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 347 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_KT-460B
TURBINE FOR KC-460B
A121.96

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026LowPX_KC-717Leak from packing
08 Aug 2026MediumPX_KC-717Repair insulation KC-717
20 Jul 2026LowPX_KC-717Inspect coupling KC-717
05 Jul 2026MediumPX_KC-717Overhaul
12 Mar 2026LowPX_KC-717Replace lamp as per PM finding
01 Mar 2026MediumPX_KC-717Leak from packing
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
15 Nov 2025LowPX_KC-717Leak from packing
19 Aug 2025MediumPX_KC-717Repair insulation KC-717
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B

Recent goods issues

Posting dateQtyOrderOrder type
19 Oct 20251201000039957Corrective