FILTER ELEMENT,AIR INTAKE,5MICRON,P/N FE

Material 4100086207 · FILTER ELEMENT · Plant 1000

AReduceExcess
Material
4100086207
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
A (9 of 14 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
38 d · P80 52 d
Unit price
Rp 3.4M

Recommendation

  • 1.Forecast 19 EA/year: 14 unplanned (recency-weighted compound poisson (own history)) + 4.3 from the maintenance plan.
  • 2.Lead time ~38 days; expected demand during lead time 1.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 16.
  • 4.Stock 28 exceeds the level to keep (16) by 12.
  • 5.Installed on 14 FuncLoc(s), 9 of them criticality A/B.
  • 6.ML early warning: 94% probability of demand in the next 90 days.
ML early warningLast turnaround used 5Single sourceOpen POSame description as 1 other material number
On hand / on order
28 / 15
next delivery 08 Oct 2026
Today Min / Max
4 / 12
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
16
order qty 10
Service level
99.8%
stockout risk now 0%
Unit price
Rp 3.4M
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 56 days ago, 11 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Intermittent · 21 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.

Installed on 14 functional locations

9 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-854C
FEED FAN
A172.28
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-308B
REFLUX BLOWER
A162.28
PX_KC-867D
CONDENSATE FAN
A162.71
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A452.81
PX_KC-317B
RICH AMINE FAN
A141.85
PX_KC-391D
QUENCH WATER COMPRESSOR
A121.43
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-264A
TURBINE FOR KC-264A
S342.39

Lead time and procurement

Lead time 38 ± 21 days (PO history, 13 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
27 Aug 2026PR04
Regular (other)
17Rp 3.4M29 Sept 202633 d
11 Aug 2026PR01
Import / long-lead
15Rp 3.3M08 Oct 2026
open
58 d
14 May 2026PR03
Regular replenishment
17Rp 3.4M31 May 202617 d
23 Apr 2026PR03
Regular replenishment
14Rp 3.4M07 May 202614 d
13 Feb 2026PR03
Regular replenishment
10Rp 3.4M08 Mar 202623 d
17 Dec 2025PR03
Regular replenishment
14Rp 3.4M29 Jan 202643 d
23 Oct 2025PR04
Regular (other)
8Rp 3.3M24 Nov 202532 d
12 Oct 2025PR03
Regular replenishment
16Rp 3.2M07 Nov 202526 d
20 Aug 2025PR06
Regular replenishment
10Rp 3.3M12 Sept 202523 d
29 Jun 2025PR06
Regular replenishment
17Rp 3.5M26 Aug 202558 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul2.15
28 Dec 2026PX_KC-308BFilter element replacement0.72
09 Apr 2027PX_KC-317BFilter element replacement0.72
29 Jun 2027PX_KC-308BFilter element replacement0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_KC-854COverhaul
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
17 Sept 2026MediumPX_KC-867DLeak from packing
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
06 Sept 2026MediumPX_KC-308BInstall scaffolding at KC-308B
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
29 Jul 2026MediumPX_KC-854CInstall scaffolding at KC-854C

Recent goods issues

Posting dateQtyOrderOrder type
06 Aug 20261201000013265Corrective
30 Jun 20261201000006875Corrective
22 Jun 20261201000027070Corrective
13 Apr 20261201000010956Corrective
09 Mar 20262204000033725Preventive
11 Feb 20261201000014945Corrective
08 Feb 20261203000032991Turnaround
05 Feb 20262201000010658Corrective
28 Dec 20251203000006078Turnaround
26 Dec 20251203000006078Turnaround
25 Dec 20251201000032192Corrective
19 Dec 20251201000025654Corrective
07 Dec 20252201000023250Corrective
05 Dec 20253203000014228Turnaround
03 Dec 20251201000032890Corrective