FILTER ELEMENT,LUBE OIL,5MICRON,P/N FE-1

Material 4100086233 · FILTER ELEMENT · Plant 1000

AMaintainHealthy
Material
4100086233
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 12 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
45 d · P80 68 d
Unit price
Rp 591,542

Recommendation

  • 1.Forecast 37 EA/year: 33 unplanned (recency-weighted compound poisson (own history)) + 3.6 from the maintenance plan.
  • 2.Lead time ~45 days; expected demand during lead time 4.8 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 17, order up to 48.
  • 4.Installed on 12 FuncLoc(s), 7 of them criticality A/B.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single sourceOpen POPlanned demand in lead time
On hand / on order
47 / 37
next delivery 23 Oct 2026
Today Min / Max
9 / 19
static parameters in BoM
Rec. Min (reorder point)
17
safety stock 13
Rec. Max
48
order qty 31
Service level
100.0%
stockout risk now 0%
Unit price
Rp 591,542
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 2 days ago, 6 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (5 units) excluded from the baseline.

Demand pattern Erratic · 38 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.

Installed on 12 functional locations

7 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-391D
QUENCH WATER COMPRESSOR
A121.43
PX_KC-476C
ETHYLENE FAN
A100.57
PX_KT-308B
TURBINE FOR KC-308B
A301.10
PX_KC-853D
SLOP OIL COMPRESSOR
B141.85
PX_KC-371B
BOTTOM FAN
B100.57
PX_KC-879A
CONDENSATE FAN
S162.71
PX_KC-730
ETHYLENE COMPRESSOR
S141.85
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KT-624A
TURBINE FOR KC-624A
S332.39

Lead time and procurement

Lead time 45 ± 30 days (PO history, 11 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
20 Sept 2026PR03
Regular replenishment
21Rp 582,88327 Nov 2026
open
68 d
07 Sept 2026PR06
Regular replenishment
16Rp 600,12023 Oct 2026
open
46 d
01 Jun 2026PR03
Regular replenishment
22Rp 584,80110 Jul 202639 d
29 Jan 2026PR03
Regular replenishment
23Rp 614,44203 May 202694 d
25 Jan 2026PR03
Regular replenishment
13Rp 586,80725 Feb 202631 d
15 Jan 2026PR03
Regular replenishment
17Rp 601,38431 Jan 202616 d
18 Sept 2025PR03
Regular replenishment
10Rp 595,07408 Oct 202520 d
31 Aug 2025PR03
Regular replenishment
9Rp 613,86223 Nov 202584 d
30 Aug 2025PR06
Regular replenishment
20Rp 573,77207 Oct 202538 d
08 Aug 2025PR06
Regular replenishment
10Rp 591,36102 Sept 202525 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_KC-853DFilter element replacement0.72
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
02 Jan 2027PX_KC-476CFilter element replacement0.72
02 Apr 2027PX_KC-853DFilter element replacement0.72
03 Aug 2027PX_KC-730Filter element replacement0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_KC-879AInspect coupling KC-879A
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
13 Sept 2026LowPX_KC-730Overhaul
07 Sept 2026MediumPX_KC-879AReplace lamp as per PM finding
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
14 Jul 2026MediumPX_KC-730Leak from packing
11 Jun 2026LowPX_KT-264ALeak from packing
10 Jun 2026MediumPX_KC-879A[MSI-B-26-PWM-186/M] Replace line
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
29 Sept 20261201000010018Corrective
20 Sept 20261201000020402Corrective
10 Sept 20261201000013299Corrective
27 Aug 20261201000004902Corrective
29 Jul 20262201000004503Corrective
07 Jul 20263201000003794Corrective
29 Jun 20262209000028044Other maintenance
20 Jun 20261201000007604Corrective
07 Mar 20261201000018039Corrective
02 Feb 20261201000013025Corrective
31 Jan 20261201000022888Corrective
28 Jan 20261201000023630Corrective
27 Jan 20261201000020819Corrective
25 Jan 20262201000004631Corrective
23 Jan 20261201000022996Corrective