FILTER ELEMENT,LUBE OIL,5MICRON,P/N FE-8
Material 4100086338 · FILTER ELEMENT · Plant 1000
AMaintainHealthy
- Material
- 4100086338
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- ANUGRAH INSTRUMEN SENTOSA PT
- Lead time
- 63 d · P80 82 d
- Unit price
- Rp 2.8M
Recommendation
- 1.Forecast 11 EA/year: 11 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~63 days; expected demand during lead time 2.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 17.
- 4.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 3Single sourceOpen PO
On hand / on order
4 / 12
next delivery 17 Oct 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
17
order qty 8
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.8M
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 49 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (3 units) excluded from the baseline.
Demand pattern Intermittent · 16 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 2 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-778A CONDENSATE COMPRESSOR | A | 2 | 3 | 1.43 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 63 ± 33 days (PO history, 7 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Sept 2026 | PR06 Regular replenishment | 6 | Rp 2.7M | 08 Dec 2026 open | 80 d |
| 16 Sept 2026 | PR06 Regular replenishment | 6 | Rp 2.9M | 17 Oct 2026 open | 31 d |
| 03 Jul 2026 | PR03 Regular replenishment | 4 | Rp 2.7M | 23 Sept 2026 | 82 d |
| 26 Apr 2026 | PR03 Regular replenishment | 10 | Rp 2.8M | 21 Aug 2026 | 117 d |
| 21 Apr 2026 | PR03 Regular replenishment | 7 | Rp 2.8M | 27 May 2026 | 36 d |
| 12 Apr 2026 | PR03 Regular replenishment | 4 | Rp 2.9M | 04 Jun 2026 | 53 d |
| 17 Jul 2025 | PR06 Regular replenishment | 7 | Rp 2.7M | 04 Oct 2025 | 79 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jun 2026 | High | PX_KC-778A | Inspect coupling KC-778A |
| 05 Nov 2025 | Medium | PX_KC-778A | KC-778A lube oil filter DP high |
| 27 May 2025 | Low | PX_KC-778A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Aug 2026 | 1 | 201000016927 | Corrective |
| 11 Aug 2026 | 1 | 201000004047 | Corrective |
| 13 Jul 2026 | 1 | 201000028281 | Corrective |
| 17 Apr 2026 | 1 | 209000024091 | Other maintenance |
| 16 Apr 2026 | 1 | 201000014761 | Corrective |
| 04 Mar 2026 | 1 | 201000006597 | Corrective |
| 29 Jan 2026 | 3 | 201000037841 | Corrective |
| 17 Jan 2026 | 1 | 201000010430 | Corrective |
| 07 Jan 2026 | 1 | 201000013162 | Corrective |
| 24 Dec 2025 | 1 | 203000033370 | Turnaround |
| 11 Dec 2025 | 1 | 201000030435 | Corrective |
| 26 Nov 2025 | 2 | 203000004045 | Turnaround |
| 11 Nov 2025 | 2 | 201000026190 | Corrective |
| 27 Sept 2025 | 1 | 201000037569 | Corrective |
| 09 Aug 2025 | 1 | 201000020369 | Corrective |