FILTER ELEMENT,AIR INTAKE,3MICRON,P/N FE
Material 4100086359 · FILTER ELEMENT · Plant 1000
AMonitorHealthy
- Material
- 4100086359
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 5 FuncLocs A/B)
- Supplier
- BERKAH TEKNIK GLOBAL PT
- Lead time
- 41 d · P80 40 d
- Unit price
- Rp 713,843
Recommendation
- 1.Forecast 11 EA/year: 9.2 unplanned (recency-weighted compound poisson (own history)) + 1.4 from the maintenance plan.
- 2.Lead time ~41 days; expected demand during lead time 1.7 (incl. 0.7 planned).
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 18.
- 4.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 87% probability of demand in the next 90 days.
ML early warningConvert to Stock ItemLast turnaround used 5Single sourcePlanned demand in lead time
On hand / on order
9 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
18
order qty 11
Service level
100.0%
stockout risk now 0%
Unit price
Rp 713,843
PO history
ML early warning: 87% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 22 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (6 units) excluded from the baseline.
Demand pattern Intermittent · 14 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 5 functional locations
2 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KC-391D QUENCH WATER COMPRESSOR | A | 1 | 2 | 1.43 |
| PX_KT-624A TURBINE FOR KC-624A | S | 2 | 3 | 2.39 |
| PX_KC-373B CONDENSATE BLOWER | S | 1 | 0 | 0.57 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 41 ± 28 days (PO history, 12 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Apr 2026 | PR06 Regular replenishment | 9 | Rp 714,939 | 18 May 2026 | 41 d |
| 23 Mar 2026 | PR06 Regular replenishment | 5 | Rp 718,539 | 26 Apr 2026 | 34 d |
| 23 Jan 2026 | PR06 Regular replenishment | 3 | Rp 708,231 | 28 Feb 2026 | 36 d |
| 25 Dec 2025 | PR03 Regular replenishment | 6 | Rp 688,104 | 20 Jan 2026 | 26 d |
| 17 Nov 2025 | PR06 Regular replenishment | 6 | Rp 702,270 | 17 Dec 2025 | 30 d |
| 11 Nov 2025 | PR01 Import / long-lead | 9 | Rp 731,391 | 27 Feb 2026 | 108 d |
| 11 Oct 2025 | PR03 Regular replenishment | 5 | Rp 692,362 | 14 Nov 2025 | 34 d |
| 01 Sept 2025 | PR03 Regular replenishment | 10 | Rp 734,912 | 22 Sept 2025 | 21 d |
| 26 Jun 2025 | PR03 Regular replenishment | 4 | Rp 732,786 | 30 Aug 2025 | 65 d |
| 06 Jun 2025 | PR06 Regular replenishment | 8 | Rp 712,747 | 27 Jun 2025 | 21 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PX_KC-373B | Filter element replacement | 0.72 |
| 02 Apr 2027 | PX_KC-373B | Filter element replacement | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
| 14 May 2026 | Low | PX_KT-397A | KT-397A trip test |
| 02 Apr 2026 | Medium | PX_KT-397A | Follow up after steam upset KT-397A |
| 07 Feb 2026 | Medium | PX_KT-624A | Replace lamp as per PM finding |
| 27 Dec 2025 | Low | PX_KC-391D | Leak from packing |
| 18 Jul 2025 | High | PX_KC-391D | KC-391D high vibration |
| 17 Jun 2025 | Medium | PX_KT-624A | [MSI-B-25-SWV-127/M] Replace line |
| 10 May 2025 | Medium | PX_KT-397A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Sept 2026 | 2 | 201000030902 | Corrective |
| 03 Jul 2026 | 1 | 204000037529 | Preventive |
| 31 May 2026 | 1 | 201000032912 | Corrective |
| 02 Mar 2026 | 2 | 201000007911 | Corrective |
| 12 Feb 2026 | 1 | 203000018609 | Turnaround |
| 10 Feb 2026 | 1 | 201000021442 | Corrective |
| 13 Jan 2026 | 1 | 201000001132 | Corrective |
| 05 Jan 2026 | 1 | 203000006950 | Turnaround |
| 26 Dec 2025 | 1 | 201000036264 | Corrective |
| 24 Dec 2025 | 3 | 203000006078 | Turnaround |
| 14 Dec 2025 | 2 | 201000033321 | Corrective |
| 05 Nov 2025 | 1 | 203000026692 | Turnaround |
| 28 Oct 2025 | 1 | 201000017612 | Corrective |
| 20 Oct 2025 | 1 | 201000031473 | Corrective |
| 14 Oct 2025 | 1 | 201000009295 | Corrective |