FILTER ELEMENT,FUEL GAS,10MICRON,P/N FE-
Material 4100086373 · FILTER ELEMENT · Plant 1000
AMonitorHealthy
- Material
- 4100086373
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 6 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 38 d · P80 31 d
- Unit price
- Rp 6.5M
Recommendation
- 1.Forecast 17 EA/year: 6.7 unplanned (recency-weighted compound poisson (own history)) + 11 from the maintenance plan.
- 2.Lead time ~38 days; expected demand during lead time 2.1 (incl. 1.4 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
- 4.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
- 5.ML early warning: 59% probability of demand in the next 90 days.
ML early warningLast turnaround used 4Single sourcePlanned demand in lead time
On hand / on order
9 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 5
Rec. Max
14
order qty 7
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.5M
PO history
ML early warning: 59% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 92 days ago, 2 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (4 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 6 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-308B REFLUX BLOWER | A | 1 | 6 | 2.28 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PY_KC-636C SLOP OIL COMPRESSOR | A | 2 | 1 | 0.57 |
| PX_KC-621 SEAL OIL FAN | A | 4 | 0 | 0.57 |
| PX_KC-669 DEMIN WATER BLOWER | A | 2 | 0 | 0.57 |
| PX_KC-730 ETHYLENE COMPRESSOR | S | 1 | 4 | 1.85 |
Lead time and procurement
Lead time 38 ± 18 days (PO history, 6 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 Aug 2026 | PR03 Regular replenishment | 2 | Rp 6.4M | 24 Sept 2026 | 24 d |
| 01 Jul 2026 | PR06 Regular replenishment | 5 | Rp 6.8M | 29 Jul 2026 | 28 d |
| 09 Nov 2025 | PR03 Regular replenishment | 4 | Rp 6.6M | 10 Dec 2025 | 31 d |
| 07 Nov 2025 | PR04 Regular (other) | 5 | Rp 6.4M | 08 Dec 2025 | 31 d |
| 29 Jun 2025 | PR03 Regular replenishment | 6 | Rp 6.5M | 13 Aug 2025 | 45 d |
| 20 Jun 2025 | PR03 Regular replenishment | 3 | Rp 6.6M | 21 Jul 2025 | 31 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PX_KC-669 | Filter element replacement | 1.43 |
| 28 Dec 2026 | PX_KC-308B | Filter element replacement | 0.72 |
| 03 Mar 2027 | PX_KC-621 | Filter element replacement | 2.86 |
| 02 Apr 2027 | PX_KC-669 | Filter element replacement | 1.43 |
| 29 Jun 2027 | PX_KC-308B | Filter element replacement | 0.72 |
| 03 Aug 2027 | PX_KC-730 | Filter element replacement | 0.72 |
| 02 Sept 2027 | PX_KC-621 | Filter element replacement | 2.86 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Sept 2026 | Low | PX_KC-730 | Overhaul |
| 06 Sept 2026 | Medium | PX_KC-308B | Install scaffolding at KC-308B |
| 14 Jul 2026 | Medium | PX_KC-730 | Leak from packing |
| 04 Jun 2026 | High | PX_KC-308B | Repair insulation KC-308B |
| 08 May 2026 | Medium | PX_KC-308B | [MSI-B-26-PPX-327] Permanent repair |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 29 Nov 2025 | Medium | PX_KC-308B | KC-308B lube oil filter DP high |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 12 Nov 2025 | Low | PX_KC-308B | Overhaul |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Jul 2026 | 1 | 201000022451 | Corrective |
| 22 Jan 2026 | 1 | 201000022788 | Corrective |
| 02 Jan 2026 | 1 | 201000024626 | Corrective |
| 02 Jan 2026 | 1 | 201000032945 | Corrective |
| 22 Dec 2025 | 2 | 203000022966 | Turnaround |
| 14 Dec 2025 | 2 | 201000013722 | Corrective |
| 07 Dec 2025 | 1 | 203000014228 | Turnaround |
| 04 Dec 2025 | 1 | 203000037280 | Turnaround |
| 19 Sept 2025 | 3 | 201000013528 | Corrective |
| 11 Sept 2025 | 1 | 201000029989 | Corrective |
| 24 Aug 2025 | 1 | 201000026429 | Corrective |
| 05 Jun 2025 | 1 | 201000027238 | Corrective |
| 25 May 2025 | 2 | 201000029009 | Corrective |