FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-3
Material 4100086395 · FILTER ELEMENT · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100086395
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 7.6 EA/year: 4.7 unplanned (recency-weighted compound poisson (own history)) + 2.9 from the maintenance plan.
- 2.Lead time ~51 days; expected demand during lead time 0.7.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 12.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 10 now.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 45% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 27.7M · order by 01 Oct 2026
Expected arrival ≈ 51 days
ML early warningPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
12
order qty 7
Service level
100.0%
stockout risk now 11%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 45% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 18 days ago, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-452 HYDROGEN FAN | A | 1 | 6 | 2.71 |
| PX_KC-479C DILUTION STEAM COMPRESSOR | A | 1 | 5 | 2.71 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_KC-452 | Filter element replacement | 0.72 |
| 01 Jan 2027 | PX_KC-479C | Filter element replacement | 0.72 |
| 02 Jun 2027 | PX_KC-452 | Filter element replacement | 0.72 |
| 03 Jul 2027 | PX_KC-479C | Filter element replacement | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Sept 2026 | Medium | PX_KC-479C | KC-479C bearing temp high |
| 05 Sept 2026 | Medium | PX_KC-452 | Overhaul |
| 05 Sept 2026 | Medium | PX_KC-452 | Inspect coupling KC-452 |
| 18 Aug 2026 | Low | PX_KC-479C | Leak from packing |
| 31 May 2026 | Medium | PX_KC-479C | [MSI-B-26-KNK-222/M] Replace line |
| 20 Jan 2026 | Medium | PX_KC-452 | Replace lamp as per PM finding |
| 04 Jan 2026 | Medium | PX_KT-513 | KT-513 governor valve hunting |
| 17 Oct 2025 | Low | PX_KC-452 | KC-452 bearing temp high |
| 23 Sept 2025 | Low | PX_KC-479C | Overhaul |
| 04 Sept 2025 | Low | PX_KC-452 | Inspect coupling KC-452 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Sept 2026 | 1 | 201000029003 | Corrective |
| 30 Jun 2026 | 1 | 209000022177 | Other maintenance |
| 04 Mar 2026 | 1 | 201000024914 | Corrective |
| 16 Oct 2025 | 1 | 201000025249 | Corrective |
| 04 Aug 2025 | 1 | 201000030859 | Corrective |
| 22 Jul 2025 | 2 | 201000014115 | Corrective |