FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-6
Material 4100086442 · FILTER ELEMENT · Plant 1000
AReorderCriticalStockout
- Material
- 4100086442
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 1.0 EA/year: 0.2 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~51 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 11.1M · order by 01 Oct 2026
Expected arrival ≈ 51 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 3%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 89.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
| PX_KC-145 ETHYLENE FAN | S | 1 | 0 | 0.57 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 04 Mar 2027 | PX_KC-150A | Filter element replacement | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 21 Nov 2025 | Medium | PX_KC-150A | KC-150A bearing temp high |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
| 21 May 2025 | Low | PX_KC-150A | PSM25/Leak from packing |
Recent goods issues
Never issued in the 17-month history.