FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-7

Material 4100086490 · FILTER ELEMENT · Plant 1000

SReduceNon-moving
Material
4100086490
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
51 d · P80 100 d
Unit price
Rp 2.8M (est.)

Recommendation

  • 1.Forecast 1.7 EA/year: 0.3 unplanned (installed-base failure prior (no history)) + 1.4 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 3 exceeds the level to keep (0) by 3.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 508,213/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~22 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-538
REFLUX BLOWER
S1124.85
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
13 Jan 2027PX_KC-538Filter element replacement0.72
15 Jul 2027PX_KC-538Filter element replacement0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
16 Sept 2026EmergencyPX_KC-538Leak from packing
01 Sept 2026MediumPX_KC-538KC-538 lube oil filter DP high
01 Sept 2026MediumPX_KC-538KC-538 high vibration
11 Jun 2026MediumPX_KC-538Leak from packing
07 May 2026MediumPX_KC-538KC-538 bearing temp high
12 Apr 2026MediumPX_KC-538KC-538 high vibration
04 Apr 2026MediumPX_KC-538Leak from packing
30 Mar 2026MediumPX_KC-538KC-538 high vibration
01 Oct 2025MediumPX_KC-538Leak from packing

Recent goods issues

Never issued in the 17-month history.