FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-9

Material 4100086519 · FILTER ELEMENT · Plant 1000

AReorderCriticalStockout
Material
4100086519
Category
FILTER ELEMENT
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
51 d · P80 100 d
Unit price
Rp 2.8M (est.)

Recommendation

  • 1.Forecast 1.8 EA/year: 0.4 unplanned (installed-base failure prior (no history)) + 1.4 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 11.1M · order by 01 Oct 2026
Expected arrival ≈ 51 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 4%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 132.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KC-730
ETHYLENE COMPRESSOR
S141.85
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KT-778A
TURBINE FOR KC-778A
S101.10

Lead time and procurement

Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
03 Aug 2027PX_KC-730Filter element replacement0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2026LowPX_KC-730Overhaul
14 Jul 2026MediumPX_KC-730Leak from packing
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
13 Oct 2025LowPX_KC-730Leak from packing
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A
09 May 2025MediumPX_KC-730Replace lamp as per PM finding
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Never issued in the 17-month history.