FILTER ELEMENT,LUBE OIL,3MICRON,P/N FE-4
Material 4100086587 · FILTER ELEMENT · Plant 1000
AReduceNon-moving
- Material
- 4100086587
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 1.4 EA/year: 0.7 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~51 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.Stock 49 exceeds the level to keep (5) by 44.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
49 / 0
no open PO
Today Min / Max
10 / 24
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 249.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 3 functional locations
1 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PX_KT-447 TURBINE FOR KC-447 | S | 4 | 13 | 6.24 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 04 Mar 2027 | PX_KC-150A | Filter element replacement | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 12 Aug 2026 | High | PY_KC-419A | KC-419A lube oil filter DP high |
| 11 Jul 2026 | Medium | PY_KC-419A | KC-419A lube oil filter DP high |
| 09 Jul 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.