FILTER ELEMENT,LUBE OIL,5MICRON,P/N FE-4
Material 4100086624 · FILTER ELEMENT · Plant 1000
ALong-leadReorderNormalBelow reorder point
- Material
- 4100086624
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI PERKASA JAYA PT
- Lead time
- 52 d · P80 100 d
- Unit price
- Rp 6.8M
Recommendation
- 1.Forecast 2.8 EA/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~52 days; expected demand during lead time 0.4.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 100 days and the fastest seen in its category 22 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 20.4M · order by 01 Oct 2026
Expected arrival ≈ 52 days
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 91 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 2 functional locations
2 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-536A LUBE OIL BLOWER | A | 3 | 11 | 4.42 |
| PX_KC-247A SLOP OIL FAN | A | 3 | 9 | 4.00 |
Lead time and procurement
Lead time 52 ± 39 days (PO history + category, 2 PO lines) · on-time 15%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Jul 2025 | PR03 Regular replenishment | 1 | Rp 6.8M | 09 Sept 2025 | 57 d |
| 08 Jun 2025 | PR04 Regular (other) | 2 | Rp 6.8M | 30 Jul 2025 | 52 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | High | PX_KC-536A | Overhaul |
| 27 Aug 2026 | High | PX_KC-247A | Inspect coupling KC-247A |
| 08 Aug 2026 | High | PX_KC-536A | KC-536A bearing temp high |
| 24 Jul 2026 | High | PX_KC-536A | Install scaffolding at KC-536A |
| 14 Jul 2026 | Medium | PX_KC-247A | Replace lamp as per PM finding |
| 05 Jul 2026 | Medium | PX_KC-536A | Leak from packing |
| 29 Jun 2026 | Low | PX_KC-247A | KC-247A high vibration |
| 24 Jun 2026 | Medium | PX_KC-536A | KC-536A bearing temp high |
| 04 Jun 2026 | Low | PX_KC-247A | KC-247A bearing temp high |
| 06 Apr 2026 | Medium | PX_KC-247A | KC-247A bearing temp high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Jul 2026 | 1 | 201000037669 | Corrective |