Sparely
DU

FILTER ELEMENT,LUBE OIL,5MICRON,P/N FE-4

Material 4100086624 · FILTER ELEMENT · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100086624
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
RAJAWALI PERKASA JAYA PT
Lead time
52 d · P80 100 d
Unit price
Rp 6.8M

Recommendation

  • 1.Forecast 2.8 EA/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~52 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 100 days and the fastest seen in its category 22 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 20.4M · order by 01 Oct 2026
Expected arrival ≈ 52 days
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.8M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 91 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.

Installed on 2 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-536A
LUBE OIL BLOWER
A3114.42
PX_KC-247A
SLOP OIL FAN
A394.00

Lead time and procurement

Lead time 52 ± 39 days (PO history + category, 2 PO lines) · on-time 15%

PR dateTypeQtyUnit priceDeliveryLead time
14 Jul 2025PR03
Regular replenishment
1Rp 6.8M09 Sept 202557 d
08 Jun 2025PR04
Regular (other)
2Rp 6.8M30 Jul 202552 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026HighPX_KC-536AOverhaul
27 Aug 2026HighPX_KC-247AInspect coupling KC-247A
08 Aug 2026HighPX_KC-536AKC-536A bearing temp high
24 Jul 2026HighPX_KC-536AInstall scaffolding at KC-536A
14 Jul 2026MediumPX_KC-247AReplace lamp as per PM finding
05 Jul 2026MediumPX_KC-536ALeak from packing
29 Jun 2026LowPX_KC-247AKC-247A high vibration
24 Jun 2026MediumPX_KC-536AKC-536A bearing temp high
04 Jun 2026LowPX_KC-247AKC-247A bearing temp high
06 Apr 2026MediumPX_KC-247AKC-247A bearing temp high

Recent goods issues

Posting dateQtyOrderOrder type
02 Jul 20261201000037669Corrective