Sparely
DU

FILTER ELEMENT,SEAL GAS,3MICRON,P/N FE-1

Material 4100086676 · FILTER ELEMENT · Plant 1000

AMaintainCritical insurance spare
Material
4100086676
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
51 d · P80 100 d
Unit price
Rp 2.8M (est.)

Recommendation

  • 1.Forecast 3.3 EA/year: 0.5 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 6.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
6
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 163.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.

Installed on 4 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-563B
GASOLINE COMPRESSOR
B200.57
PX_KC-422A
C4 PRODUCT BLOWER
S362.71
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
31 Dec 2026PX_KC-563BFilter element replacement1.43
02 Jul 2027PX_KC-563BFilter element replacement1.43

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
08 Jul 2026MediumPX_KC-422AKC-422A high vibration
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
03 Mar 2026LowPX_KC-422ALeak from packing
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
20 Jan 2026LowPX_KC-422ALeak from packing
24 Nov 2025LowPX_KC-422AKC-422A lube oil filter DP high

Recent goods issues

Never issued in the 17-month history.