FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-1
Material 4100086709 · FILTER ELEMENT · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100086709
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 7 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 1.3 EA/year: 1.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~51 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 455.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 7 functional locations
2 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PX_KC-447 LUBE OIL COMPRESSOR | A | 1 | 4 | 1.85 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KT-383A TURBINE FOR KC-383A | S | 3 | 7 | 3.67 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_KT-624A TURBINE FOR KC-624A | S | 1 | 3 | 2.39 |
| PX_KC-890A INHIBITOR FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
Recent goods issues
Never issued in the 17-month history.