FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-8
Material 4100086983 · FILTER ELEMENT · Plant 1000
AReduceNon-moving
- Material
- 4100086983
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~51 days; expected demand during lead time 0.0.
- 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 3 exceeds the level to keep (2) by 1.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
98.6%
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 46.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-588 CAUSTIC FAN | A | 1 | 2 | 1.00 |
| PX_KC-801 DEMIN WATER FAN | A | 1 | 2 | 1.43 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Apr 2026 | Emergency | PX_KC-801 | KC-801 high vibration |
| 22 Feb 2026 | Medium | PX_KC-588 | KC-588 lube oil filter DP high |
| 12 Jul 2025 | Low | PX_KC-801 | KC-801 bearing temp high |
| 24 May 2025 | Medium | PX_KC-588 | Repair insulation KC-588 |
Recent goods issues
Never issued in the 17-month history.