FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-5
Material 4100087140 · FILTER ELEMENT · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100087140
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 4.8 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~51 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 13.9M · order by 01 Oct 2026
Expected arrival ≈ 51 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 11 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_KC-419A PROPYLENE FAN | A | 1 | 19 | 5.71 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 04 Mar 2027 | PX_KC-150A | Filter element replacement | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | High | PY_KC-419A | Overhaul |
| 23 Sept 2026 | Medium | PY_KC-419A | Inspect coupling KC-419A |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 18 Sept 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 31 Aug 2026 | Medium | PY_KC-419A | Install cover plate for MCP cracking |
| 28 Aug 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 12 Aug 2026 | High | PY_KC-419A | KC-419A lube oil filter DP high |
| 11 Jul 2026 | Medium | PY_KC-419A | KC-419A lube oil filter DP high |
| 09 Jul 2026 | Medium | PY_KC-419A | Install scaffolding at KC-419A |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2026 | 1 | 201000020402 | Corrective |