FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-3
Material 4100087168 · FILTER ELEMENT · Plant 1000
SMaintainNo stock needed
- Material
- 4100087168
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 0.9 EA/year: 0.2 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~51 days; expected demand during lead time 0.7 (incl. 0.7 planned).
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 100%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 316,548/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~22 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-264A C4 PRODUCT FAN | S | 1 | 5 | 1.85 |
| PX_KC-891A HYDROGEN FAN | S | 1 | 5 | 1.85 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 05 Nov 2026 | PX_KC-264A | Filter element replacement | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Sept 2026 | Medium | PX_KC-891A | KC-891A high vibration |
| 12 Jul 2026 | Low | PX_KC-264A | Leak from packing |
| 19 Apr 2026 | Emergency | PX_KC-264A | Install scaffolding at KC-264A |
| 20 Feb 2026 | Medium | PX_KC-891A | [MSI-B-26-RKP-241/M] Replace line |
| 09 Nov 2025 | Low | PX_KC-891A | Repair insulation KC-891A |
| 30 Oct 2025 | Low | PX_KC-264A | Install scaffolding at KC-264A |
| 27 Sept 2025 | Medium | PX_KC-264A | Leak from packing |
| 12 Sept 2025 | Medium | PX_KC-891A | Install scaffolding at KC-891A |
| 22 Jul 2025 | Medium | PX_KC-264A | [MSI-B-25-HVW-347/M] Replace line |
| 09 May 2025 | Medium | PX_KC-891A | KC-891A bearing temp high |
Recent goods issues
Never issued in the 17-month history.