FILTER ELEMENT,FUEL GAS,5MICRON,P/N FE-3

Material 4100087168 · FILTER ELEMENT · Plant 1000

SMaintainNo stock needed
Material
4100087168
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
51 d · P80 100 d
Unit price
Rp 2.8M (est.)

Recommendation

  • 1.Forecast 0.9 EA/year: 0.2 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 0.7 (incl. 0.7 planned).
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Convert to Non StockPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 8
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 100%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 316,548/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~22 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-264A
C4 PRODUCT FAN
S151.85
PX_KC-891A
HYDROGEN FAN
S151.85

Lead time and procurement

Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
05 Nov 2026PX_KC-264AFilter element replacement0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
12 Jul 2026LowPX_KC-264ALeak from packing
19 Apr 2026EmergencyPX_KC-264AInstall scaffolding at KC-264A
20 Feb 2026MediumPX_KC-891A[MSI-B-26-RKP-241/M] Replace line
09 Nov 2025LowPX_KC-891ARepair insulation KC-891A
30 Oct 2025LowPX_KC-264AInstall scaffolding at KC-264A
27 Sept 2025MediumPX_KC-264ALeak from packing
12 Sept 2025MediumPX_KC-891AInstall scaffolding at KC-891A
22 Jul 2025MediumPX_KC-264A[MSI-B-25-HVW-347/M] Replace line
09 May 2025MediumPX_KC-891AKC-891A bearing temp high

Recent goods issues

Never issued in the 17-month history.

Sparely