FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-4

Material 4100087504 · FILTER ELEMENT · Plant 1000

AReorderCriticalStockout
Material
4100087504
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
51 d · P80 100 d
Unit price
Rp 2.8M (est.)

Recommendation

  • 1.Forecast 1.0 EA/year: 0.3 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 13.9M · order by 01 Oct 2026
Expected arrival ≈ 51 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.9%
stockout risk now 100%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 119.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-178A
QUENCH OIL FAN
A100.57

Lead time and procurement

Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
05 Nov 2026PX_KC-178AFilter element replacement0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.