FILTER ELEMENT,SEAL GAS,25MICRON,P/N FE-
Material 4100087529 · FILTER ELEMENT · Plant 1000
AReduceSlow-moving
- Material
- 4100087529
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 51 d · P80 100 d
- Unit price
- Rp 2.8M (est.)
Recommendation
- 1.Forecast 4.1 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~51 days; expected demand during lead time 0.6.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 11.
- 4.Stock 324 exceeds the level to keep (11) by 313.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
324 / 0
no open PO
Today Min / Max
9 / 16
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
11
order qty 5
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 270 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 636.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~22 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-435A FUEL OIL AIR COMPRESSOR | A | 1 | 2 | 1.00 |
| PX_KT-202 TURBINE FOR KC-202 | S | 1 | 4 | 2.81 |
| PX_KC-236B DILUTION STEAM FAN | S | 1 | 1 | 0.57 |
Lead time and procurement
Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 09 Jan 2026 | Medium | PX_KT-202 | KT-202 governor valve hunting |
| 16 Nov 2025 | Medium | PX_KC-435A | Overhaul |
| 17 Sept 2025 | Medium | PX_KT-202 | Replace lamp as per PM finding |
| 06 Jul 2025 | Low | PX_KT-202 | KT-202 steam leak at gland |
| 12 May 2025 | Medium | PX_KC-435A | Inspect coupling KC-435A |
| 06 May 2025 | Medium | PX_KC-236B | PSM25/Install scaffolding at KC-236B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Jan 2026 | 2 | 201000022429 | Corrective |
| 30 May 2025 | 4 | 201000014829 | Corrective |