Sparely
DU

FILTER ELEMENT,SEAL GAS,5MICRON,P/N FE-6

Material 4100087748 · FILTER ELEMENT · Plant 1000

SReduceNon-moving
Material
4100087748
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
51 d · P80 100 d
Unit price
Rp 2.8M (est.)

Recommendation

  • 1.Forecast 2.4 EA/year: 0.2 unplanned (installed-base failure prior (no history)) + 2.1 from the maintenance plan.
  • 2.Lead time ~51 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 12 exceeds the level to keep (0) by 12.
Convert to Non StockPrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
12 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 2.8M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 361,943/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~22 days.

Installed on 2 functional locations

0 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-458D
SLOP OIL FAN
S393.14
PX_KT-875
TURBINE FOR KC-875
S301.10

Lead time and procurement

Lead time 51 ± 39 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
04 Feb 2027PX_KC-458DFilter element replacement2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026MediumPX_KC-458DKC-458D lube oil filter DP high
16 Sept 2026LowPX_KC-458DKC-458D lube oil filter DP high
24 Jun 2026MediumPX_KC-458DKC-458D bearing temp high
15 Mar 2026MediumPX_KC-458DPainting KC-458D
27 Dec 2025MediumPX_KC-458DInstall scaffolding at KC-458D
09 Dec 2025MediumPX_KC-458DOverhaul
24 Nov 2025MediumPX_KC-458DKC-458D lube oil filter DP high
05 Sept 2025LowPX_KC-458DReplace lamp as per PM finding
21 May 2025MediumPX_KC-458DInspect coupling KC-458D

Recent goods issues

Never issued in the 17-month history.