FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-8
Material 4100087764 · FILTER ELEMENT · Plant 1000
SMonitorHealthy
- Material
- 4100087764
- Category
- FILTER ELEMENT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- MEGA ELEKTRIK ABADI PT
- Lead time
- 65 d · P80 100 d
- Unit price
- Rp 2.1M
Recommendation
- 1.Forecast 1.8 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~65 days; expected demand during lead time 0.2.
- 3.A 82.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
82.8%
stockout risk now 2%
Unit price
Rp 2.1M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 99 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~22 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 65 ± 39 days (PO history + category, 2 PO lines) · on-time 58%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Apr 2026 | PR03 Regular replenishment | 1 | Rp 2.0M | 20 Jul 2026 | 91 d |
| 03 Feb 2026 | PR03 Regular replenishment | 2 | Rp 2.1M | 27 Apr 2026 | 83 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Jun 2026 | 1 | 201000034485 | Corrective |