FILTER ELEMENT,FUEL GAS,3MICRON,P/N FE-8

Material 4100087764 · FILTER ELEMENT · Plant 1000

SMonitorHealthy
Material
4100087764
Category
FILTER ELEMENT
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
MEGA ELEKTRIK ABADI PT
Lead time
65 d · P80 100 d
Unit price
Rp 2.1M

Recommendation

  • 1.Forecast 1.8 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~65 days; expected demand during lead time 0.2.
  • 3.A 82.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
82.8%
stockout risk now 2%
Unit price
Rp 2.1M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 99 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~22 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 65 ± 39 days (PO history + category, 2 PO lines) · on-time 58%

PR dateTypeQtyUnit priceDeliveryLead time
20 Apr 2026PR03
Regular replenishment
1Rp 2.0M20 Jul 202691 d
03 Feb 2026PR03
Regular replenishment
2Rp 2.1M27 Apr 202683 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A

Recent goods issues

Posting dateQtyOrderOrder type
24 Jun 20261201000034485Corrective