Sparely
DU

BLADE,ROTOR,MODEL UI440,A105

Material 4100088078 · BLADE · Plant 1000

AReduceExcess
Material
4100088078
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
181 d · P80 263 d
Unit price
Rp 381.5M (est.)

Recommendation

  • 1.Forecast 4.2 SET/year: 4.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~181 days; expected demand during lead time 2.1.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 7.
  • 4.Stock 22 exceeds the level to keep (7) by 15.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
22 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 4
Rec. Max
7
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 381.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 20 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~99 days.

Installed on 5 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-383A
TURBINE FOR KC-383A
S273.67
PX_KT-202
TURBINE FOR KC-202
S342.81
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 181 ± 109 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
11 Sept 20261201000021470Corrective