BLADE,ROTOR,MODEL RM472,A182F11

Material 4100088191 · BLADE · Plant 1000

AMonitorInsurance gap
Material
4100088191
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
181 d · P80 263 d
Unit price
Rp 381.5M (est.)

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~181 days; expected demand during lead time 0.3.
  • 3.A 97.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.0%
stockout risk now 24%
Unit price
Rp 381.5M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~99 days.

Installed on 5 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A472.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 181 ± 109 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.