Sparely
DU

BLADE,ROTOR,TYPE VD801,GRAPHITE

Material 4100088290 · BLADE · Plant 1000

AMaintainCritical insurance spare
Material
4100088290
Category
BLADE
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
GEMILANG REFRAKTORI JAYA PT
Lead time
181 d · P80 263 d
Unit price
Rp 338.3M

Recommendation

  • 1.Forecast 0.3 SET/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~181 days; expected demand during lead time 0.1.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
1 / 1
next delivery 04 Jul 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 338.3M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 582.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~99 days.

Installed on 3 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A372.81
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 181 ± 109 days (Category estimate, 0 PO lines) · on-time 20%

PR dateTypeQtyUnit priceDeliveryLead time
16 Jan 2026PR06
Regular replenishment
1Rp 338.3M04 Jul 2027
open
534 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland

Recent goods issues

Never issued in the 17-month history.