VALVE,GOVERNOR,SIZE TY103,INCOLOY

Material 4100089735 · VALVE · Plant 1000

AReduceNon-moving
Material
4100089735
Category
VALVE
Base unit
ASS
MRP type
Non Stock
Criticality
A (2 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 238.3M (est.)

Recommendation

  • 1.Forecast 0.9 ASS/year: 0.9 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.1.
  • 3.A 89.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 12 exceeds the level to keep (1) by 11.
  • 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
89.2%
stockout risk now 0%
Unit price
Rp 238.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 377.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 8 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
11 Jun 2026LowPX_KT-264ALeak from packing
24 May 2026HighPX_KT-383AKT-383A steam leak at gland

Recent goods issues

Never issued in the 17-month history.