Sparely
DU

VALVE,GOVERNOR,SIZE HU795,A182F11

Material 4100089763 · VALVE · Plant 1000

AMonitorSlow-moving
Material
4100089763
Category
VALVE
Base unit
ASS
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
RAJAWALI REFRAKTORI PRATAMA PT
Lead time
47 d · P80 92 d
Unit price
Rp 336.0M

Recommendation

  • 1.Forecast 4.0 ASS/year: 4.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.5.
  • 3.A 98.4% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
2 / 1
next delivery 15 Mar 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
98.4%
stockout risk now 0%
Unit price
Rp 336.0M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 265 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 6 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-624A
TURBINE FOR KC-624A
S132.39
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
21 May 2025PR01
Import / long-lead
1Rp 336.0M15 Mar 2027
open
663 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
09 Jan 20261201000030113Corrective