VALVE,GOVERNOR,SIZE YP943,MONEL
Material 4100089807 · VALVE · Plant 1000
AMaintainStockout
- Material
- 4100089807
- Category
- VALVE
- Base unit
- ASS
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- RAJAWALI REFRAKTORI PRATAMA PT
- Lead time
- 47 d · P80 92 d
- Unit price
- Rp 204.2M
Recommendation
- 1.Forecast 2.3 ASS/year: 2.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~47 days; expected demand during lead time 0.3.
- 3.A 96.3% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Single sourceOpen POLead time estimated
On hand / on order
0 / 6
next delivery 22 Dec 2027
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
96.3%
stockout risk now 0%
Unit price
Rp 204.2M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 29 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 989.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Apr 2026 | PR03 Regular replenishment | 2 | Rp 204.2M | 19 Jul 2028 open | 829 d |
| 20 Mar 2026 | PR03 Regular replenishment | 2 | Rp 196.7M | 22 Dec 2027 open | 642 d |
| 27 Sept 2025 | PR03 Regular replenishment | 2 | Rp 211.0M | 04 Jan 2028 open | 829 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 20 Nov 2025 | Medium | PX_KT-856A | KT-856A governor valve hunting |
| 16 Nov 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 04 Sept 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Sept 2026 | 1 | 201000024663 | Corrective |
| 20 Jul 2025 | 1 | 205000012589 | Other maintenance |