VALVE,GOVERNOR,SIZE UI72,CS

Material 4100089818 · VALVE · Plant 1000

AMaintainCritical insurance spare
Material
4100089818
Category
VALVE
Base unit
ASS
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
47 d · P80 92 d
Unit price
Rp 238.3M (est.)

Recommendation

  • 1.Forecast 0.4 ASS/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~47 days; expected demand during lead time 0.1.
  • 3.A 95.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.0%
stockout risk now 0%
Unit price
Rp 238.3M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 170.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B

Recent goods issues

Never issued in the 17-month history.