VALVE,GOVERNOR,TYPE NC948,A105

Material 4100089858 · VALVE · Plant 1000

ALong-leadReduceExcess
Material
4100089858
Category
VALVE
Base unit
ASS
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
RAJAWALI REFRAKTORI PRATAMA PT
Lead time
120 d · P80 92 d
Unit price
Rp 186.7M

Recommendation

  • 1.Forecast 2.3 ASS/year: 2.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~120 days; expected demand during lead time 0.8.
  • 3.A 95.7% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 5 exceeds the level to keep (3) by 2.
  • 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 20 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
5 / 2
next delivery 15 Oct 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
95.7%
stockout risk now 0%
Unit price
Rp 186.7M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 9 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 991.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-778A
TURBINE FOR KC-778A
S101.10

Lead time and procurement

Lead time 120 ± 30 days (PO history + category, 2 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
08 Jul 2026PR03
Regular replenishment
2Rp 195.8M15 Oct 2027
open
464 d
20 Jan 2026PR03
Regular replenishment
1Rp 184.1M18 Aug 2026210 d
11 Sept 2025PR03
Regular replenishment
1Rp 186.7M20 May 2026251 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
23 Jun 2025MediumPX_KT-383AKT-383A governor valve hunting
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
22 Sept 20261201000039118Corrective