VALVE,GOVERNOR,SIZE WV395,SS304

Material 4100089947 · VALVE · Plant 1000

AReorderCriticalStockout
Material
4100089947
Category
VALVE
Base unit
ASS
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
DUTA SEJAHTERA ABADI PT
Lead time
47 d · P80 92 d
Unit price
Rp 138.4M

Recommendation

  • 1.Forecast 2.1 ASS/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~47 days; expected demand during lead time 0.3.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 3 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 ASS
Rp 415.1M · order by 01 Oct 2026
Expected arrival ≈ 47 days
Single sourceOpen POLead time estimated
On hand / on order
0 / 1
next delivery 24 Apr 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.2%
stockout risk now 12%
Unit price
Rp 138.4M
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 179 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 436.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~20 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 47 ± 30 days (Category estimate, 0 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
17 Sept 2025PR01
Import / long-lead
1Rp 133.8M24 Apr 2027
open
584 d
06 Jun 2025PR03
Regular replenishment
1Rp 142.9M10 Jun 2026369 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
05 Apr 20262204000004365Preventive