GREASE,LITHIUM,NLGI 1,180KG

Material 4100091495 · GREASE · Plant 1000

AMonitorExcess
Material
4100091495
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
CAHAYA ELEKTRIK JAYA PT
Lead time
22 d · P80 28 d
Unit price
Rp 318,023

Recommendation

  • 1.Forecast 3,764 KG/year: 2,833 unplanned (recency-weighted compound poisson (own history)) + 931 from the maintenance plan.
  • 2.Lead time ~22 days; expected demand during lead time 168.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 563, order up to 985.
  • 4.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 5,275Single sourceAbnormal consumption
On hand / on order
4,723 / 0
no open PO
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
563
safety stock 395
Rec. Max
985
order qty 422
Service level
99.7%
stockout risk now 0%
Unit price
Rp 318,023
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 12 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (5,350 units) excluded from the baseline.

Demand pattern Erratic · 53 issue days · 20 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 6 functional locations

5 with criticality A/B · 5,000 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_MOV-335A
MOTOR OPERATED GATE VALVE
A5000.06
PX_MOV-1875
MOTOR OPERATED GATE VALVE
B3,00000.06
PX_MOV-755
MOTOR OPERATED GATE VALVE
B1,20000.06
PX_PP-1749A-M
MOTOR FOR PP-1749A
B5000.19
PX_PP-688-M
MOTOR FOR PP-688
B50000.19
PX_PP-771B-M
MOTOR FOR PP-771B
C20000.19

Lead time and procurement

Lead time 22 ± 12 days (PO history, 19 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
03 Sept 2026PR06
Regular replenishment
7,919Rp 304,33521 Sept 202618 d
05 Aug 2026PR03
Regular replenishment
6,095Rp 328,33418 Aug 202613 d
11 Jun 2026PR05
Project / turnaround
17,752Rp 322,80812 Jul 202631 d
31 May 2026PR06
Regular replenishment
11,606Rp 308,88821 Jun 202621 d
10 May 2026PR03
Regular replenishment
13,012Rp 324,19724 May 202614 d
22 Mar 2026PR06
Regular replenishment
6,463Rp 312,27907 Apr 202616 d
20 Mar 2026PR03
Regular replenishment
15,708Rp 323,06508 Apr 202619 d
14 Mar 2026PR03
Regular replenishment
12,110Rp 323,74311 Apr 202628 d
14 Feb 2026PR03
Regular replenishment
9,339Rp 328,65805 Mar 202619 d
11 Feb 2026PR06
Regular replenishment
14,021Rp 314,07618 Feb 20267 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
31 Oct 2026PX_PP-1749A-MRe-greasing Bearing Motor35.8
01 May 2027PX_PP-1749A-MRe-greasing Bearing Motor35.8
02 Sept 2027PX_MOV-755Re-greasing Gear Box MOV859

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 202650201000009141Corrective
15 Sept 20261,000201000022663Corrective
28 Aug 20261,000201000007716Corrective
16 Jul 2026200201000007763Corrective
10 Jun 20261,000201000028417Corrective
06 Jun 202650201000034391Corrective
27 May 2026200201000037289Corrective
18 May 202625201000039669Corrective
07 May 202650201000007370Corrective
03 May 202625201000027251Corrective
19 Apr 202650201000015645Corrective
05 Apr 202650201000010400Corrective
02 Mar 2026200201000034390Corrective
16 Feb 202625201000005011Corrective
16 Feb 202650201000036952Corrective