GREASE,LITHIUM,NLGI 2,0.4KG

Material 4100091556 · GREASE · Plant 1000

AMonitorExcess
Material
4100091556
Category
GREASE
Base unit
KG
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
DUTA ENERGI ABADI PT
Lead time
37 d · P80 58 d
Unit price
Rp 296,126

Recommendation

  • 1.Forecast 1,575 KG/year: 1,431 unplanned (recency-weighted compound poisson (own history)) + 143 from the maintenance plan.
  • 2.Lead time ~37 days; expected demand during lead time 146.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 458, order up to 741.
  • 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 5,450Single sourceAbnormal consumptionOpen POSame description as 1 other material number
On hand / on order
5,296 / 3,057
next delivery 05 Oct 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
458
safety stock 313
Rec. Max
741
order qty 283
Service level
99.6%
stockout risk now 0%
Unit price
Rp 296,126
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 12 issue days in the last 180 days, last issue 8 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 7 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6,475 units) excluded from the baseline.

Demand pattern Lumpy · 27 issue days · 7 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 3 functional locations

2 with criticality A/B · 3,225 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1797-M
MOTOR FOR PP-1797
A3,00000.19
PX_PP-1024-M
MOTOR FOR PP-1024
B2500.19
PY_MOV-1817B
MOTOR OPERATED GATE VALVE
C20000.06

Lead time and procurement

Lead time 37 ± 18 days (PO history, 16 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
10 Sept 2026PR03
Regular replenishment
1,708Rp 282,52205 Oct 2026
open
25 d
08 Sept 2026PR03
Regular replenishment
1,297Rp 304,23528 Sept 202620 d
26 Aug 2026PR05
Project / turnaround
1,349Rp 285,24330 Oct 2026
open
65 d
24 Aug 2026PR03
Regular replenishment
1,355Rp 298,80130 Sept 202637 d
24 Jul 2026PR03
Regular replenishment
4,483Rp 302,38914 Aug 202621 d
05 Jul 2026PR06
Regular replenishment
3,005Rp 302,19928 Jul 202623 d
04 Apr 2026PR01
Import / long-lead
3,949Rp 297,19101 Jun 202658 d
18 Mar 2026PR04
Regular (other)
4,500Rp 279,07003 May 202646 d
15 Feb 2026PR06
Regular replenishment
4,136Rp 289,57014 Apr 202658 d
19 Dec 2025PR01
Import / long-lead
3,562Rp 301,46917 Feb 202660 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PY_MOV-1817BRe-greasing Gear Box MOV143

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
23 Sept 202650201000030211Corrective
09 Sept 202650201000035941Corrective
06 Sept 202650201000030840Corrective
25 Aug 2026200201000026767Corrective
10 Aug 202625201000001982Corrective
29 Jun 202650201000032450Corrective
19 Jun 202625201000022104Corrective
11 Jun 202650209000008419Other maintenance
05 Jun 202650201000005500Corrective
30 Apr 202625201000015105Corrective
16 Apr 202625209000024091Other maintenance
10 Apr 202650201000031635Corrective
31 Jan 202650203000033471Turnaround
11 Jan 202625201000033496Corrective
01 Jan 202625201000037561Corrective